Product | Plastic Hollow Formwork |
Type | Construction formwork |
Material | PP plastic |
Size | 915*1830mm/1220*2440mm |
Thickness | 12mm/15mm/18mm/20mm |
PP hollow construction formwork is an energy-saving and environment-friendly green product. It is a new product after wooden formwork, steel formwork, and aluminum formwork. It has many advantages such as a flat and clean surface, easy assembly and removal, good stability under bad weather, and easy maintenance.
The advantages of PP hollow construction formwork:
1. With the properties of lightweight, strong strength, high hardness, good impact resistance, wear resistance, and the surface is flat and clean, the shaped effect after pouring is very good.
2. It doesn’t absorb water and doesn’t mildew or deform. It doesn’t delaminate after soaking in the water for the long run. The size of the board is very stable and is very suitable for use in a damp environment.
3. With good toughness, it can be used as various special-shaped templates with curved surfaces; It is resistant to acid, alkali, and corrosion, no anti-corrosion treatment is required during use and storage, and does not pollute the surface of the concrete.
4. It is an energy-saving and environment-friendly product. No pollution and no toxic gas.
5. It is easy to demould and no releasing agent is required. Just lightly tapping, the formwork has fallen. This contributes to shortening the construction period, saving power, and speeding up the progress.6. It is easy to process. It can be nailed, sawed, and drilled. Easy assembly and convenient removal, quick, safe, and convenient supporting operation contribute to construction and improve progress.
6. It can be used as concrete wall forms, concrete slab forms, concrete column forms, etc.
The following pictures of concrete walls is shaped by using our Concrete Wall Forms.
Our plastic formwork works as Concrete Wall Forms, the shaped concrete wall is perfect.
Compare Yaohang’s PP hollow formwork with other formwork.
Contrast items | Yaohang new hollow plastic building template |
PVC plastic building formwork | Wooden building formwork | Aluminum building formwork |
Reusable Time | 60-100 times | 20-30 times | 4 to 6 times | Around 50 times |
Drop test(10m) | unbroken | unbroken | rupture | broken |
Corrosion Resistance | Good | No | No | No |
Abrasion resistance | wear-resistant | wear-resistant | No | No |
After absorbing water | No deformed | No deformed | deformed | deformed |
Demoulding difficulty degree | Easy demoulding | Easy demoulding | hard demoulding | hard demoulding |
How hard it is to nail | Easy to drive nails | hard to drive nails | easy to drive nails | hard to drive nails |
expansion-contractility | Very small | It varies widely according to temperature scale |
small | small |
Energy conservation and emission reduction |
Can be recycled | Can be recycled | It uses a lot of wood | Can be recycled |
Weight (KG/m²) | 8.4 | 13 | 7.2 | < 25 |
Quality Inspection Method
Flexibility test
Toughness test when the formwork is bent, use a forklift to crush the formwork that is not in the same plane ( one side is grounded, one side is placed obliquely) and the formwork is intact without damage after a rebound.
Shrinkage test
put the two formwork side by side on the wooden board to record the gap distance between the two boards. After two days and two nights, the distance is more than 3-5mm. Compare with the previously measured data.
Impact strength test
Use a small hammer with a round head to slam the smooth surface of the plastic building formwork and observe the surface depression. Good-quality building templates will have depressions, but there will be no cracks.
Nail-holding strength
Nail at a distance of 5 mm from the edge of the plate. If there is no crack, this indicates that the quality of the plate is good, after the nail is nailed, observe whether the bonding state of the nail and formwork is saturated and tight.
Make an Inquiry.
Customers’ Visit
FAQ
1. Is the sample free?
As a factory, we would like to provide a free sample to you, and the international courier fee is borne by your side. But we will deduct the courier fee from your first order to show our sincerity in working with you.
2. Are you a real factory?
Yes, we are a true factory, welcome you to visit and factory.
3. What’s your MOQ?
At the beginning of our cooperation, your small quantity is acceptable.
4. What’s your lead time?
Usually, it is 7-10 days after your deposit.
5. What’s your payment term?
Usually, we consider T/T, but we can talk about the payment terms.
6. Why should we choose you?
High quality, technical support, and competitive price.